Week of November 10

EAGLEWOOD LOOP WATER LINE PROJECT UPDATE 11-10-21


Please note: Crews will be paving over the water line trenches tomorrow, 11-11-21, on Eaglewood Loop between Rockwood Drive and Woodbriar Way (see map below). Since the trenches extend through the intersections, it will be difficult to drive through this area to exit the loop. Please enter or exit Eaglewood Loop at either end without driving through this stretch of road. Residents who live on Rockwood and Woodbriar will still be able to drive in and out to their homes, but we want to minimize traffic in this area as much as possible. 

Thanks again for your patience and understanding.  After tomorrow, there will be no more work in the road until spring.

NSL Engineering

801-335-8700

Traffic Control Plan Nov 11th